Machine shop control: utilization you can bill and trace you can prove
Spindle hours, scrap causes, and heat-lot genealogy — the three numbers that separate profitable shops from busy ones.

UTILIZATION FROM REAL CLOCKS
Operators clock operations, so machine utilization is measured, not estimated. The dashboard shows the NLX bottlenecked at 96% and the saw at 41% — which is a scheduling insight and a capex argument in one screen.
SCRAP WITH A CAUSE CODE
Every scrapped piece logs machine, employee, cause, and cost. Roll it up and the material-utilization loss report tells you exactly where margin leaks: this quarter it was tool wear, and the fix was an insert change interval, not a lecture.
TRACE IN FORTY SECONDS
Serial GV-2214-03 → WO-5012 → heat H-8842 → mill cert with chemistry and mechanicals. The recall drill that used to take an afternoon of binders takes forty seconds — which is also what API Q1 auditors want to see.
DELIVERY PROMISES THAT HOLD
On-time delivery holds at 94% because promises come from finite capacity and live progress. When op 30 runs 1.8 hours against a 3.5 standard, the ship date confidence updates itself.
Explore the module → · 60-second video walkthroughs →
See it on your data. Bring one real job — a quote, a traveler, and the invoice — and watch it flow end to end in a 30-minute live demo.