WORKOVER ERP
Modules
Services
Industries
Migrations
Videos
Blog
Pricing
Contact
BOOK A DEMO
Workover ERP

ERP for oil & gas service companies and machine shops — from lead to lien release, in one database.

Modules

ProcurementSales & QuotingJob RoutingMachine ShopQuality (API Q1)Financials

More modules

InventoryField TicketingTime & LaborDoc AI / OCRAI AgentsDashboardsCAD to QuoteSchedulingShipping & QCMaintenanceMarketingOperator WorkspaceMaster Data & Access

Company

PricingMigrationsIntegrationsBook a demoSchedule appointmentContact usAll modulesServicesIndustriesWhy switch

© 2026 Workover ERP. Built for Machine Shops.

QAQ-05 · QUALITY ASSURANCE

QUALITY ASSURANCE BUILT FOR API Q1

Workover ERP embeds quality into the job itself: NCRs, CAPAs, NDT results, mill certs, and MTRs attach to work orders, QA hold points gate the routing, and audit-ready records are generated as a by-product of running jobs — not as separate paperwork.

Get startedLearn more
INSIDE THE PRODUCT
CAPABILITIES

WHAT'S INSIDE QUALITY ASSURANCE

QAQ-05 · 01

NCR MANAGEMENT

Nonconformances raised from any station, dispositioned (use-as-is, rework, scrap), and tied to the job and operation.

QAQ-05 · 02

CAPA WORKFLOWS

Corrective and preventive actions with root cause, owner, due date, and effectiveness checks.

QAQ-05 · 03

NDT & INSPECTION RESULTS

MPI, UT, hardness, and dimensional results recorded against hold points on the traveler.

QAQ-05 · 04

MILL CERTS & MTRS

Material test reports are attached at receiving and follow heat numbers to every job and shipment.

QAQ-05 · 05

DOCUMENT CONTROL

Controlled procedures and work instructions, versioned, with read acknowledgment.

CAPTURE

AUDIT-READY RECORDS

Every stamp, cert, and disposition is time-stamped and attributable — API Q1 and ISO 9001 audits pull from live data.

QUALITY ASSURANCE IN FOUR MOVES

1

GATE

MPI inspection is a hold point on WO-2041 — the traveler stops until it passes.

2

RECORD

The inspector logs results and attaches the report; the mill cert is already on the job.

3

DISPOSITION

A thread gauge failure raises an NCR, dispositioned to rework with a CAPA opened.

4

PROVE

At audit time, the full quality record for any job is one search away.

FAQ

QUALITY ASSURANCE — QUESTIONS WE GET

Does Workover ERP support API Q1 requirements?+

Yes. Traceability, hold points, NCR/CAPA workflows, controlled documents, and attributable inspection records are built into the routing and quality modules, giving you the operational records API Q1 audits look for.

HOW ARE NCRS LINKED TO JOBS?+

An NCR is raised against a specific work order and operation, carries its disposition and cost impact, and feeds trend reports by part family, machine, and operator.

CAN MILL CERTS AND MTRS BE ATTACHED AUTOMATICALLY?+

Yes. Certs captured at receiving attach to the heat number, and every job that consumes that heat inherits the cert — it appears in the job record and ship pack without manual filing.

DOES THE AI FLAG QUALITY TRENDS?+

Yes. The QA Escape agent watches NCR patterns and surfaces repeat root causes — for example, three thread-gauging NCRs in a month all tracing to the same lathe.

SEE QUALITY ASSURANCE ON YOUR DATA


Bring one real job. We'll show it running end-to-end in a 30-minute live demo.

BOOK A LIVE DEMO

RELATED MODULES

Job Routing →Machine Shop →AI Agents →Procurement →