Fabrication jobs sprawl. The work order shouldn't.
Plate, structurals, buyouts, coating, heat treat, NDE — a fab job touches half your vendors and all your floor. One work order should hold it together.

CUT LISTS WITH MEMORY
Released drawings become cut lists by material and thickness. Drops go back to stock as remnants that keep their heat number — so next month's bracket can legally come out of this month's offcut.
OUTSIDE PROCESSES ON THE SAME GANTT
Coating and heat treat ride the traveler as PO-backed operations with promised dates on the schedule. When the coater slips, the jobs downstream reslot and the customer note drafts itself.
WELD MAPS IN THE RECORD SET
Joints map to procedures and welders; the fabrication record compiles with the cert package at shipment. The 'who welded joint 14' question takes a click.
WATCH THE ESTIMATE WHILE YOU CAN ACT
Plate overages and rework hours show against the estimate mid-job. Month-end costing is too late on a three-week fab job — live costing is the difference between correcting and confessing.
ERP for Fabrication → · All eight services →
See it on your data. Bring one real job — a quote, a traveler, and the invoice — and watch it flow end to end in a 30-minute live demo.